Phillips Academy Andover MA
Owner/Client: Phillips Academy Andover
Location: Andover, MA
Date Completed: August 1998
Project Manager: Christopher Brown
Project Value: $8,000
Project Summary:
Rescon was contracted to seal water leaks in a precast underground tunnel. The tunnel housed a main steam line along with crucial electrical and phone wiring for the school. Due to the water leaks and the warm steam lines moisture levels would rise causing problems with the wiring. The project was completed primarily using our injection techniques for sealing precast concrete joints.
NH Fisher Cats Scoreboard
US Postal Service – Boston MA
Haverhill MA Basement Water Control
WMUR Manchester NH Water Control
Newburyport MA Water Control
Andover MA Concrete Crack Injection
Dover NH Basement Water Control
US Navy – Newport RI Concrete Crack